The following are REC's current rates, terms and conditions of service.
Terms and Conditions

Rates Available from Rappahannock Electric Cooperative

Downloadable Rate Schedules for each use type:


  • TMR-NT: Transition Migration Rider

    A transition migration rider applies to members in the area formerly served by Allegheny Power.

  • A: Farm, Home & Civic Service

    Farms, Single Residences, Private Schools, Church Sanctuaries, Volunteer Fire Departments, Volunteer Rescue Squads, Civic Clubs and similar non-profit community service organizations
  • AL-NT: Private Outdoor Lighting


  • B - 1: Small General Service

    Available to single phase non-residential up to 25 kW of demand
  • B - 3: General Service

    Available to all single phase non-residential accounts with demand greater than 25kW and all three phase customers with less than 200 kW of demand.
  • EF - Excess Facilities

    Available whenever excess facilities are provided as described in the Schedule. The EF tariff does not apply to the LP 2 tariff
  • F: Fees

    Fees and charges for Customer-specific activities.


  • GV: Small Power Production Facilities

    Available to Customers with small power production facilities which qualify under Section 210 of the Public Utility Regulatory Policies Act of 1978, and which have a total design capacity of 100 kilowatts or less
  • HD - 1: Large Power High Diversity Service

    Available to all three phase non-residential accounts contracting for a demand greater than 500kW. For more information contact a key accounts representative at 1-800-920-9288 or by email at keyaccounts@myrec.coop.

  • IS-1: Interruptible Service Rider

    Available upon request to customers that can reduce demand during peak times when called upon. For more information contact a key accounts representative at 1-800-920-9288 or by email at keyaccounts@myrec.coop.
  • LP - 1: Large Power Service

    Available to all three phase non-residential accounts with demand greater than 100kW. (Firm Rate)


  • LP - 2: Closed Heavy Industrial Service

    Available to any industrial Customer contracting for a load of 10,000 kW or more and whose load will be served from a delivery point of the Cooperative's wholesale supplier of electric power and energy devoted exclusively to the service of that Customer
  • LP - 3: Large Industrial Served by Dedicated Substation

    Available to all three phase non-residential accounts contracting for a demand of 5000kW with-in 5 miles of a substation. For more information contact a key accounts representative at 1-800-920-9288 or by email at keyaccounts@myrec.coop.
  • MSL: Municipal Street Lighting





  • Net Energy Metering Rider

    Available to any distribution Customer owning and operating a renewable fuel generator on his premises which uses as its fuel source solar, wind, or hydro energy, and is primarily intended to offset part or all of the Customer's own electricity requirements


  • Net Metering Notification Form

    The State Corporation Commission requires this form be completed and submitted to the Cooperative prior to installing eligible net energy metering generating equipment. A prospective net metering customer considering installing a renewable fuel generator with a capacity in excess of 25 KW is strongly encouraged to contact the electric distribution company prior to making financial commitments to the project.
  • OL: Street, Highway and Ground Lighting Service

    Available upon request to Customers along the lines of the Cooperative for street, highway, and ground lighting
  • OLN: Outdoor Lighting



  • PE: PrePaid Electric Service

    Available, on a voluntary and limited basis, to Cooperative Customers, subject to the Terms and Conditions of the Cooperative on file with the Virginia State Corporation Commission, and subject to the availability of the necessary automated metering infrastructure at the Customer’s location.

    Appendix D, PrePay Brochure, PrePay Fact Sheet, PrePay FAQ, PrePay Terms & Conditions.
  • PCA: Power Cost Adjustment Clause

    The Power Cost Adjustment (PCA) changes periodically to reflect the Cooperative's current wholesale costs of electricity and the fuels used to generate it. This State Corporation Commission approved adjustment is a pass-through of actual costs, plus or minus any over- or under-recovery of generation costs incurred.

    Applicable to all Rate Schedules except HD-1, LP-2, and LP-3. In accordance with Section IV of Schedule PCA - 1, all bills issued on or after January 1, 2017, will be adjusted by a credit of $0.004635 per kilowatt hour. This adjustment is based on both the Cooperative’s projected wholesale power cost for 2017 and the Demand Response Rider. To view the Power Cost Adjustment rate schedule, To view the rate schedule, click here.
  • R-TOU: Time of Use Service

    Available, on a voluntary and limited basis, to residential consumers in the territory served by the Cooperative as of May 30, 2010, who, by adjusting energy use patterns, may benefit from lower Electricity Supply Service rates during off-peak periods at the risk of paying higher Electricity Supply Service rates for electricity used during peak periods.
  • 74: County and Municipal Services

    Available to non State Corporation Commission Jurisdictional Entities (public schools, municipal buildings, water plants, sewer plants, etc.).



  • Competitive Service Provider

    Available to eligible members who opt to use an electricity supply service provider other than the Cooperative.
  • Demand Response - A/C Switch Program Schedule DR Rider - 2017