Commercial members can help facilitate new or expanded service requests by filling out the Connected Load Information form.
(* required field)
The information provided in this document by the member or contractor is critical to the Cooperative in sizing the appropriate distribution facilities for reliable, quality of service to the member. This information will also be used to determine the installation cost, necessary easements and costs for rights of ways, monthly facility charges, estimated billing and deposits/guarantees if required as well as estimated construction timeline and completion date.
*The Cooperative reserves the right to designate and/or approve the location of all metering and C.T. equipment. The company must approve all proposed metering arrangements.
**NOTE: The member must notify the cooperative prior to the actual connection of any future load (as required by the Terms and Conditions).